501R Logan Ave "Logan Mews"
Overview
- Ward: Toronto-Danforth (Ward 30)
- Status: Completed
Toronto Hydro-Electric System Limited (THESL) is planning to install underground electrical system on your street. The service will entail the supply to the new Brookside Townhouses. The proposed work will involve the installation of concrete encased ducts and overhead cables on the municipal property.
The streets affected by this project include:
- Gerrard Street East
- Logan Avenue
- Simpson Avenue
During the course of our work, we do not anticipate any power interruptions. Should they be required we will endeavour to keep the interruptions to a minimum and to give you prior notice.
Restoration will be done in various stages during construction of the project. The grass or sidewalk will be replaced with new sod or concrete where we excavate. In addition, all asphalt or concrete driveways will be replaced between the curb and sidewalk if affected by our excavation. Where no sidewalk exists, we will replace the portion of the driveway between 450mm on either side of our excavation trench or right up to the curb if the curb is within 1.0m of our trench.
Updates
- There are currently no updates for this project.